Delay Station for Head Lamps
Purpose: The machine was designed to allow a delay of 12 mins for the curing of sealant used to seal the lens of head lamp with its body.
Softwares Used: Solid Works
Design Time: 64 hrs
Drafting Time: 80 hrs
Number of Components: 150
Output: Complete 3D model, 2D drawings of each component, Manufacturing Instructions, Mechanism Simulation, collision detection, Rendered Images and complete bill of material.
Advertisement
Categories: Parametric Modeling
2D, 3D, Animation, assembly, CAD, Exploded view, Freelance, Head Lamps, High Res, Mechanisms, Parametric, Product Visualization, Simulation, Solid Works
